Construction

  • Basement (Building 1) - steel reinforced concrete ground beams
  • Ground floor slabs (Buildings 2-5) - 550mm thick concrete raft slab
  • Upper floors - steel reinforced concrete slab
  • Roofs – timber trusses with powder coated long run metal roof cladding
  • Wall structure – a mixture of concrete tilt slab, solid masonry and steel post and beam structure with timber-framed walls
  • Exterior wall finishes and cladding:

  -  Brick - 70mm clay bricks over 50mm cavity
  -  Rendered solid masonry with a paint finish

  • Internal walls - 2.7 metre stud height in all apartment living spaces
  • Balconies – steel reinforced concrete with floating timber decking
  • Balustrades – powder-coated metal

Fit Out

  • Central hot water system in each building providing unlimited metered hot water
  • A heat pump for heating and cooling
  • Smoke alarms
  • LED lighting
  • 100% Solution dyed nylon carpet
  • Wardrobe organisers

Kitchen

Engineered stone benchtops

Porcelain tiled kitchen splash back

15mm European engineered timber flooring or porcelain tile flooring

Quality manufactured kitchens with soft close drawers

Smeg kitchen appliances

New Zealand made Methven tapware

Externally vented range hoods

Bathroom

Porcelain floor and wall tiles

New Zealand made vanities from Newtech

Polymarble basins from Newtech

Recessed mirror cabinets

Heated towel rails

10mm Frameless glass showers with New Zealand made custom stainless steel shower bases

Parking

Secure car parks in the basement of Building 1 are avaiable for purchase with all apartments.